Residents are generally not even required to be home at the time of replacement.
Water meter replacement procedure.
Obtain permit from the code department.
The building or house address s must be permanently attached and visible.
For surface water sources it is normally installed at the high lift raw water pumping station.
For groundwater systems at the well house.
Most meters were replaced in the mid to late 80 s in dubuque.
How will i know if my meter needs to be replaced.
Their vehicles will also be appropriately marked with their.
There will be interruption of service for approximately 20 minutes during the change.
Water meters keep tabs on how much water residents of a home consume.
It is important to size any compound meter installation to minimize the total flow each installation experiences in the changeover flow range.
If no water is being used the meter will be replaced.
In addition the new system will include new water meter technology that will save labor time ensure accuracy.
34 water meters selection installation testing and maintenance all compound meters lose a certain degree of accuracy operating within the changeover flow range by varying amounts.
Kitchener utilities will send you a letter informing you that the meter needs to be replaced.
This bmp will.
In general water supply meters are used in the following area of applications.
When was the last city wide meter replacement project.
Meter reading testing replacement and data management are key responsibilities that every water company or utility must address.
There is no charge for the meter replacement.
When it fails to work properly qualified maintenance workers from your local water district will come out and replace the water meter.
New york american water and our selected contractor technicians are required to be in uniform and carry company issued photo id badges.
20 30 minutes for smaller meters and longer for large meters.
Water meters are the basic link between a water company and its customers.
Why is my water meter being replaced.
The letter will direct you to make an appointment by calling neptune.
Typically the procedure takes approx.
Therefore they must be replaced every 20 to 25 years.
Meter reading and data management are discussed in the previous bmp on customer water use data collection and management.
Meter replacement faq 1.
New water meter installation procedure 1.
For 1 5 or larger water meters an inspection of the plumbing must be made by meter shop personnel then the water meter will be given to the contractor to install.
The water meter will be checked to verify that water is presently not in use.
Water meters and their registers often lose accuracy as they age.